Route closures this autumn for South Wales Metro works
Written by Gavin on 18th September 2024
Transport for Wales (TfW) is urging all customers to check before they travel as work to deliver the South Wales Metro will impact services this autumn.
TfW is moving closer to delivering the South Wales Metro, with brand-new electric trains set to begin operating on the Merthyr, Aberdare and Treherbert lines from the autumn and more trains now running between Pontypridd, Caerphilly, Rhymney and Cardiff following a major timetable change in June.
To deliver further benefits to customers, TfW needs to undertake significant engineering work this autumn which will result in buses replacing trains on some Valley lines.
From Saturday 28 September to Sunday 6 October, no trains will run from Merthyr Tydfil, Aberdare or Treherbert to Radyr for 9 days, rather than 23 days as previously communicated. During this time, teams will carry out over 30 pieces of engineering work, which is essential to allow TfW to deliver an increased frequency of four trains per hour from the head of each valley.
The planned work includes significant track and signalling upgrades at Pontypridd station, the removal of the original Treforest station footbridge for donation to a heritage railway, and track-side cleaning works throughout the network.
During this time, buses will replace trains between Treherbert, Merthyr Tydfil, Aberdare and Radyr, with all train services to Cardiff Central starting and terminating at Radyr. More information on the rail replacement services and service impacts can be found here.
The Cardiff Half Marathon Sunday 6 October
For those travelling to the Cardiff Half Marathon on Sunday 6 October, TfW will be running additional bus services from Merthyr, Aberdare and Treherbert, alongside an additional early morning rail service from Radyr which gets into Cardiff before 9am. A customer support operation will also be in place at Pontypridd and Radyr.
More information about the additional services can be found on our events page.
Engineering works at Cardiff Queen Street Station
Engineering works will take place through Cardiff Queen Street station from Sunday 27 October to Sunday 03 November to carry out essential track and signalling upgrades in preparation for more trains to run through the station.
As Cardiff Queen Street station is a major junction for the Valley, City and Cardiff Bay services, several lines will be affected, with no rail services running on the Coryton, Rhymney or Penarth lines. TfW advises all passengers to check before they travel as there will be rail replacement buses in operation or ticket acceptance with bus operators.
The ticket office at Cardiff Queen Street station will remain open throughout the closure to allow passengers to purchase tickets and find information on services.
Further details on the two major rail closures can be found here. Please note, that line closures will continue across the coming months, including weekend and mid-week evening closures on the Coryton and Rhymney lines. A full list of all upcoming rail closures affecting the Valley lines can be found here.
The transformation of the Core Valley Lines for the Metro has been part-funded by the European Regional Development Fund through the Welsh Government and will enable faster, more frequent services between Cardiff and the heads of the valleys.